home
end customers
case studies
contact

Link

This is a transportation component that has previously been a welded construction.
In op.1 several slip fit reamed holes are widened which have to be in line 0.004"
after the part is released. This is achieved by a stress free location adapting
to the datum points. In op.2 all remaining features are machined.


Langhorst Consulting
204 N.Shenandoah Dr. #101.
Latrobe, PA 15650
Tel: 724-757-2476
heinz@langhorstconsulting.com